Saturday, October 30, 2010

Roof, Rain and a Looming Deadline

Scott returned to Logan last Monday and together we are heading back to Torrey next Monday. We haven’t been on a single backpacking trip for an entire year. To remedy that sorry state, one of the very first things we’ll do when we arrive is pack up our llamas and hit the trail. We plan to head down Harris Wash for a late-season, multi-day trip ensconced in red rock heaven.

This begs the question, how is it possible we’ve found ourselves with this backcountry deficit when we love exploring that landscape so much? The answer is a combination of a roof, too much rain and a looming deadline.

One reason we’ve chosen to build with straw bales is their high r-value. R-value, or resistance value, is a measurement used to designate the insulating value of specific materials used in construction.  Higher R-values indicate a material's greater ability to insulate. Three inches of fiberglass insulation has an R-value of 11. Straw bale walls have r-values ranging from 40 - 55. This means we’ll be very toasty in winters, cool during the summers and our low utility bills will put smiles on our faces.

With walls like that, it only makes sense to have a tight roof as well. The design of our roof should provide an r-value in the neighborhood of 60. From the inside out, our roof consists of 2” x  8” tongue and groove from salvaged ponderosa pine trees, roofing felt, 16” scissor trusses filled with nearly five tons of cellulose insulation made of recycled newspapers, 5/8 inch sheathing, 1 1/2 inch foam covered with reflective radiant barrier and, finally, metal that matches the roof on the garage. I guess you could think of it as the Dagwood sandwich of the roofing world.

To make our project a little more interesting, the wiring for the entire house must come through the roof. That’s because we don’t want any penetrations in the walls since those could conduct moisture into the straw.

Let’s just say the progress of the roof construction has been hindered by busy schedules and atypical rain. Scott was in Torrey for 12 days prior to his return to Logan. It rained for nine of those days. Not much building happens when the sky is pouring on your project.

As it stands now, there is tongue and groove plus felt on about half of the roof. All of the scissor trusses are up.




Most of the wiring is in. But there is oh so much more to be done. It’s raining right now. There is snow on the peaks. Our season is coming to a close. Without a roof, we cannot get the solar panels on the house. Without solar panels, our heating system isn’t complete. To get our grant from the state of Utah, this all must be done by March.


We’ve worked hard all season. The trip with our llamas will be wonderful. Then we’ll see what can be finished before winter sets in.

No comments:

Post a Comment