In A Comedy of Errors, Balthazar said, “Small cheer and great welcome makes a merry feast.” He did, however, neglect to mention that it’s easier to be cheerful and welcoming if one has a kitchen in which to prepare an actual feast. After working toward that end for almost the entire summer, Scott returned to Logan from Torrey on Saturday with a smile on his face because, at long last, our kitchen is finished!

It was actually almost done on August 5th. Unfortunately a series of events caused a delay. The foremost of those events was a miscalculation on the amount of cork we needed to cover the floor. When we decided to use cork, we looked at several products and decided to purchase Cleopatra Chocolate Brown Floating Cork Flooring made by DuroDesign, a Canadian floor manufacturer whose Salt Lake City dealer is Underfoot Floors.

This is a pretty pricey product, but the color was exactly what we were looking for. In addition, according to DuroDesign’s website, “Cork is a completely renewable resource harvested as bark from living cork trees, never harmed by the harvest. Our cork flooring is composed of 100% post-industrial recycled content from wine-stopper production.” This was the product for us.

Unfortunately, because the product comes from Canada, the cost of shipping was almost as much as the actual cork. Yikes! Luckily for us, the folks at Underfoot Floors combined our order with another client’s order, and we were able to split the cost of shipping with them. Whew!

Everything arrived right on time. We carefully read and re-read the directions and went to work, following the instructions step by step.

 “Before installing DuroDesign Floating Floor, cover concrete floor with 6 mil polyethylene sheets, run up the wall 3”, overlap seams 8”, and tape the sheets together. Install plank over this moisture barrier.”

As we began setting the cork in place, we were careful to follow the official instructions exactly even though the instructions were a copy of a copy of a copy of a copy. Eventually we resorted to reading with a magnifying glass but finally went to the internet, which yielded easy-to-read directions.

We doggedly used the special tool provided by DuroDesign because of this warning: “IMPORTANT! To do this you will need a hammer and the SPECIAL DURODESIGN TAPPING BLOCK. DO NOT USE ANY OTHER TAPPING BLOCK. Using any other tapping block may result in damage to the cork wear layer.”

This is the “special DURODESIGN TAPPING BLOCK.” Only, because we could hardly use the special block without hammering our fingers, we had to modify it by adding a piece of 2X4 so we could actually hold the tool. There were specific instructions about labeling on the special DURODESIGN TAPPING BLOCK. “Using DURODESIGN tapping block and a hammer place block FLAT on floor, with the side up that is labeled: ‘This Side Up For Tapping On Groove’, tap on block gently until the ends of the two planks are firmly joined.”

Not only did we need to modify the “special” tool so we could hold it, there was no labeling to be seen. And the word “tapping” was an understatement. We had to “tap” with a mighty heavy hammer and with an alarming amount of force to get the pieces to click together.

As we neared the end of the project, it was apparent there were not going to be enough cork pieces.
We made zero mistakes and this was all that was left.
Unfortunately, we needed one more piece of cork to finish. The only time in the entire five years of building this house when we left the material estimation up to someone else and we came up short. (The folks at Underfoot had calculated for us from a detailed drawing of our floor plan.)

A terse phone call to Underfoot Floors registered our displeasure. Eric promised to quickly place an order to DuroDesign for three more pieces - three because we might need an extra piece or two for future repairs. And we left Torrey with an almost-finished cork floor.

One week ago Scott returned to Torrey. He stopped by Underfoot Floors to pick up the new pieces. The pieces were there, on time, with our name on them. They didn’t even ask us to pay for them. That went a long way to make us feel better about their miscalculation.

In the course of three days Scott installed the last piece of cork, washed the entire floor,

Applied the required four coats of polyurethane,

Made and attached all of the trim on the toe kicks,

And on the curved walls (before),

(after)

Manufactured a transition between the earthen floor of the living room and the kitchen and finally moved the refrigerator into place.

Kitchen complete. Let the small cheer, good welcome and merry feast begin!

Tuesday, August 6, 2013

Accounting for Fun

Since I must return to work in Logan soon, our summer building season is quickly drawing to a close. Reviewing the "to do" list last week provided great satisfaction because we were able to cross off most of our projects.

The Pretty Big Things:
* grout and seal the bedroom floor
* finish  Scott's office: metal on counters and put trim on walls
* add the facade to the entryway pony wall and install doorknob coat hangers
* hang exterior lights and cover outlets
* build wheelchair ramp
* clean and re-wax the veranda posts

 And the Really Big Ones
* sand, stain and place the window seat
* apply last plaster coat and aliz to exterior
* paint exterior bump outs
* lay veranda pavers
* THE KITCHEN: oven, counter, sink and cooktop (We're in the middle of putting down the cork floor right now.)

Whew!

Mom, Scott and Jessica standing beside clean posts

The finished window seat

An almost completed kitchen

The bathroom fully ready for use

An inviting veranda

Riley, Scott and I had time for a trip to Blind Lake, a popular destination on Boulder Mountain.


Still, Scott and Riley couldn't resist a bit more construction.

But, despite a brief few hours spent searching for two of our llamas who got off their stake out lines, we had plenty of time for skipping stones.

Sunday, August 4, 2013

An Eight-Foot Veranda

Utah code requires a 3-foot by 3-foot solid landing outside each door. Compacted dirt will not meet this code requirement. It also doesn’t meet our code either. The amount of dirt that has been tracked in and then swept out of this house is phenomenal, so getting that solid landing has been the ultimate goal from the get go. By the time the inspector put this requirement on the list, we had already ordered the pavers for the entire veranda. At that point, we were just waiting for delivery of pavers and for Riley’s arrival.

In early July, the folks from Loa Builders delivered 1800 pavers on nine pallets which they strategically placed around the house.


 
At the same time, they used their fork lift to move Mort the Mixer from the middle of the driveway to a resting spot while he awaits repairs.



While we finished laying tile in the kitchen, Riley enjoy a few hours of removing straw and more resistant material from veranda.




Then Mary and Riley used a screed board to level the base of the veranda.
  

Then Scott used a roller filled with water and sand to compact the dirt.
 

Riley watered the dirt in order to compress it even more.


Next the boys laid black pavers around the perimeter of the veranda. This served two purposes: to hide the unsightly cement work that bounded the veranda and  to raise the entire veranda 2 1/4 inches. This would help keep rain water away from the earthen walls.




It does rain in Torrey. This summer the monsoon arrived on Big Apple Day. It has rained, off and on, almost everyday since.


We needed to decide on a pattern. The choices we considered were running bond and herringbone. We chose herringbone.


Since one never knows what the future holds, we decided to build a wheelchair ramp on the west side of the house. Now we'll always be able to enter the house easily, and, if we should ever get a piano, it will be a cinch to get it inside.

Following the initial screed activity, we had to screed the area one more time, this time adding sand to fill the space. We would set the pavers in this sand.



Riley and I got right to work setting the pavers in place.





As you can see from this movie, we were serious about getting the job done quickly.



Riley swept sand into the spaces between the pavers.




At the same time, Scott cut and placed pavers in the spaces against the house where whole pavers didn't fit.




At last we were done. I'm sure we'll be spending several moments every day sitting here.


The Window Seat

The best thing about our house is the view out the windows of the south bump out. From the beginning, we planned for a seat under those windows so we could spend many hours looking at our world in comfort. To that end, Mel Olsen, our cabinet maker in Cache Valley, built a beautiful pine window seat in four sections. We brought those sections to Torrey at the same time we brought Riley from Salt Lake. And he became the key to our ability to finish the list we had received from the inspector in June.

The south bump out is the one exterior wall that is not made of straw. We thought installing such huge windows on top of just two rows of bales was not worth the challenges. Instead of straw, this is a stud wall filled with Icynene, the castor oil-based, foam insulation we also used in the bump out ceiling. This stud wall makes the installation of our window seat very easy, especially when compared to other projects.

 Riley and I sanded and stained the window seat sections.







Once the sections were in place in the south bump out, Riley screwed them securely to the stud wall.


I put the shelves in place, awaiting the day when they would be filled with books.


The finished window seat is a great spot to play the guitar, contemplate the day, or


just enjoy watching the world.