Sunday, November 21, 2010

The State of Things

We left Torrey to return to Logan at 11:15 on Saturday, November 13. Stegner, Arion and Charlie (our llama family) peered out the windows of the trailer not happy about spending the next six and half hours in such close proximity to each other. The paraphernalia of Torrey life was crammed into every available crevice and gap of the truck.

Dave at the saw
Tyse on porch decking
As we pulled away, Dave and Tyse were finishing the last of the decking on the porch roof. There was nothing more Scott and I could do for the moment and Logan obligations called from the north.

Reviewing the progress of this second building season, we have...

* put a wood-burning stove in the yurt
* planted and fenced 20 trees - 10 cottonwoods, 1 Fat Albert blue spruce, 5 blue spruce seedlings, 2 apple trees, 1 plum tree, 1 cherry tree
* installed the PEX for the entire floor
* poured the concrete floor in the bedroom, office, kitchen and master bathroom
* laid the first five inches of the earthen floor (the last one inch to be installed later)
* insulated the foundation with Pink Panther rigid foam
* mortared slate to the entire exterior of the foundation
* built a sill plate for the straw bale walls
* buried the 21,000 pound water storage tank for the solar water heating system
* graded the building site to eliminate piles of dirt and fill in holes
* finished and raised all of the timber frame (HOORAY!!!)
* assembled the core of the Tempcast masonry heater
* purchased and stacked 500 bales of straw in the garage and to the north of the garage
* cut, sanded and sealed all of the porch posts, rafters and beams
* erected the porch
* framed the interior walls
* selected and purchased almost all of the lights for the interior and exterior of the house (This had to be done in order for the electrician to wire the house.)

Solar Mechanical "Room"
Trent Hunt has placed all of the electrical wires above the ceiling. Phillip Winters has completed as much of the solar heating and water system as is possible without a finished roof. Tyler Torgerson and crews have completed the decking for the entire ceiling and porch plus added the waterproof felt layer and the metal drip edge.

While we work here in Logan, Tyler and crew will continue working. Eventually the phone will ring, and we’ll head back to Torrey to blow the insulation into the roof.

For now, Scott and I have called a hiatus. We know the first, middle, last and nick names of every piece of wood in our entire house. Our sweat, tears and not just a little blood linger everywhere. There is still so much to be done. Maybe we can complete our 2010 "to-do list" before the 2011 season begins.
November 2010








November 2009

Monday, July 6, 2009

What A Difference a Day Makes

A little more than a week later we returned to Torrey to orchestrate the installation of utilities. Once we arrived, it was clear to us that these men needed no conductor. They had obviously worked together before. Phil Winter and his crew had already run the water line to the garage. As we drove up, Trent Hunt was in the process of digging the trench for the electricity and phone line. There was also another open trench bringing water to our yurt.

It was the next day, however, that brought out the full cast. By noon, there were more pickups and large pieces of equipment on the site than I could have imagined. All at once we were surrounded by Double T’s crew; electricians Trent Hunt and Nate Hallows; Terry Hunt and Dave Torgerson from South Central Communications; Courtney Cropper and Scott Grundy of Garkane Power; Scott Chestnut from Torrey Town and Wes Jensen who will design and install our septic system. They way they worked together was quite a thing to see.

At one point, with trenches going every which way, irrigation water began flowing from the canal down the phone line trench. Everyone grabbed a shovel to block the water, but Trent deftly saved the day with one well-placed scoop from the backhoe. By three that afternoon we had water, electricity (along with a new transformer), phone and internet.

Many of the books we read suggested it could be challenging to coordinate the installation of all of these services in a rural area. But I must speak to the friendly, helpful and professional service all of these men provided. In fact, late in the day, with an umbrella held over his head to keep the rain off of his laptop, Terry Hunt performed the last few keystrokes to confirm the successful operation of our DSL. Amazing!

I think there may never again be that many people working at one time on our house...that is until we have a straw bale wall raising or a plastering party.