Showing posts with label Masonry heater. Show all posts
Showing posts with label Masonry heater. Show all posts

Tuesday, May 29, 2012

Adobe Wall

As I write this post, I am reminded that our initial building plan was to complete this house in just three years. I am also reminded of the construction adage: building will always take more money and more time than you think. This is indeed true for yet another pair of home builders - us.

Scott and I have been back in Torrey for one week now. However Scott completed a big project here while I was wrapping up loose ends in Logan. He built the adobe wall behind our masonry stove. Our thinking is that our masonry stove will heat our big main room and, at the same time, heat the adobe wall. The warm wall will then heat the air in Scott's office on the other side.

So, in early May, Scott contemplated this stack of 151 adobe bricks, which we made last summer with the help of my brother John's family: Wesley, Casey, Kelli, Jessica, Barbara and John.



 
First Scott framed an 8-foot X 8-foot wall.
He then set up a story pole on the edges of the studs. The purpose of a story pole (also called preacher board or jury stick) is to keep the wall level and plumb as well as to keep the courses at the correct height. He stretched a string aligned with the marks on the story pole and stacked the wall.




One concern we hoped to address was the stability of such a narrow, tall wall - 5 1/2 inches wide by 8 feet tall. To tie the entire wall together, Scott placed a masonry ladder (a welded-metal lattice) within the mortar every other course. The ends of the ladder were attached to the frame on each side of the wall.

The mortar recipe was essentially the same mix used in the plaster on the exterior of the house - high-clay-content dirt from our property, a little added masonry sand, finely chopped straw and water. 




One month later, the mortar has dried and the wall seems perfect. The only thing we have left to do is plaster both sides. That should happen this summer.

Friday, January 6, 2012

Christmas Hearth

Scott and I spent the Christmas holiday in, yep, Torrey. We had a short list of things to do...all of them related to preparation for a spring plaster festival. (Extra hands, energy and heart are always always welcome to join us.)

The most exciting event of the entire week was arriving to discover Wade had completed the facade for our Tempcast stove.

This is what greeted us when we first arrived.








Wade came over to make sure we were happy with his work. Who wouldn't be. It is absolutely beautiful. You can find more of Wade's work here.







It kept us toasty night after night, just as advertised. It is entirely possible that this stove could warm the entire house even without the radiant heat in the floor. However, I'm sure we'll be glad to have both systems in place.

Saturday, December 17, 2011

The Allure of Indoor Work

As long as I can remember, my dad worked in construction.  His were not small-time projects. They were big deals which included hospitals, high schools, university housing and office towers. I’m guessing he began as a laborer, but he eventually became a well-respected superintendent who always completed his jobs on time and under budget. I think one of the hardest things he had to deal with though was inclement weather. Dad always worried about a winter concrete pour, or cranes operating safely in the cold, or the possibility of ice falling on employees.

Now, whenever I see construction workers, bulky in their multi-layer garb, welding the framework of a three-story office building or moving pre-fab walls into place, and doing all of this in the grasp of winter’s icy hand, I remember watching my dad do the very same thing. I’m sure they, like my dad, are happy when the walls of a project are finally up and the grip of snow and wind clutches air and brick instead of cloth and skin.

When we asked our neighbor and mason friend, Wade Hansen, if he might be interested in creating the facade for our masonry heater, I completely understood the smile that appeared on his face as he contemplated the possibly of indoor work (complete with heat, light and plumbing) in December. His bid was one we decided we had to afford because Wade’s work is so beautiful. Here are photos of his progress thus far. We are lucky to have such a fine craftsman working with us.




Thursday, August 4, 2011

Adobe Bricks

The interior wall that abuts our Tempcast masonry heater will be built with adobe bricks which will then be plastered. The logic behind this design is that the masonry heater will heat our house and, at the same time, the adobe wall. The heat from the wall will radiate into the room on the opposite side of the wall, Scott's office.

Monday we had a family work party. The goal? To make 150 adobe bricks, 5 1/2 inches wide by 3 1/2 inches tall by 14 inches long. While Doug and Shanna manned the mortar mixer, the rest of the family went into production mode.

Wesley rinses brick forms.
Barb, Wesley and Kelli fill forms with plaster.
Kelli smooths plaster.
John uses a double form.
Wesley uses a stick screed to remove excess plaster from form.
Jessica fills buckets with clay for the mixer.
Casey keeps Missy company.
Adobe bricks lined up inside the house.
In less than half a day, we made one hundred and fifty-one bricks. Eventually they will go into our heater wall.

Saturday, August 21, 2010

Waiting to Exhale

Last week we finished working with all of the timbers for our house - 42 purlins; 8 trusses each composed of 6 members: two top cords, one bottom cord, two struts and one king post; 16 posts; 44 braces; 16 girts and 20 splines. Every piece is sanded, sealed with Skidmore's Liquid Beeswax, fitted and waiting under a tarp for the moment it will stand together with its brothers and sisters as the frame of our house. All around the building site you see blue and silver tarps covering pieces of our house. Scott reminds me that some people put cars on blocks in front of their houses. We have put pieces of a house on blocks in front of our car.

I've returned to Logan to resume my part time work at Utah State University, but Doug, Shanna and Scott have continued preparing for the raising of our timber frame. The tractor (named Orangejello) proves to be the useful tool we had hoped it would be, especially now, as it is instrumental in making piles of dirt disappear into the holes left behind following each excavation.

In less than a week, despite day after day of rain, they have even erected the core of our Tempcast masonry heater. Here's a tour of their work.

The pieces are laid out.










Doug applies mortar in preparation for the next part.










More mortar...










More mortar...










Scott custom cuts a hole for the flue.






It begins to look like a masonry heater instead of just a pile of cement blocks.










Another course...










The last two courses are the heaviest pieces weighing in at 126 pounds. This requires a scaffold assist.





Scott stands beside the almost completed heater.









Scott and Doug contemplate the last piece.









The last piece...











The heater is not really finished. This is just the core. Once the walls of the house are up, and we are happily whiling away our time with finish work, we'll add an attractive facade which we haven't yet decided upon.

The fitting of all of the timbers has taken place in two dimensions on the ground, so we don't REALLY know that our grand plan will work. We are tired. We are anxious. We are excited. We are waiting until our mentors from Teton Timberframe arrive next Tuesday. It will be a big day (or several). We are ready to move on to something less demanding. Maybe that will be the strawbale walls. We are waiting to exhale.

Tuesday, April 27, 2010

Rebates

A few years ago we subscribed to Natural Home Magazine.  Their subscription page states that they give, “...an up-to-date outlook on current trends in sustainable building and wholesome living. Natural Home gives today’s eco-conscious homeowners the information they need to live in nurturing, healthy homes.” It sounds pretty new-agey, but the magazine really does have some good information. In fact, my only complaint rests with the homes they often feature. These are typically 4,500 square foot plus homes with green denim insulation or inspired landscaping. To us, it seems like most of the homes are structures that require the homeowner to have vaults full of money that enable them to build a “sustainable and wholesome” home.

Scott and I don’t have money like that. We feel like regular folks who hope to live in a home that allows us to exist in harmony with our planet. Yes, we’ve got our own eco-slant, but we really would like to build our house using local resources, work with folks who will be our neighbors and, when we are finally moved in, have completed a project that didn’t violate our commitment to taking care of Mother Earth.

Budget plays a large role in our decisions. I’ve been keeping track of our expenses in several spreadsheets: garage construction, house construction, site preparation and landscaping, things we would have bought anyway and tools. (It’s astounding how much money goes into tools!)

After receiving bids for windows, a roof and the garage, we noticed everything seemed to come in increments of $30,000. When I mentioned this to my dad, he chuckled and said he and Mom had observed  a similar phenomenon when they built their house in the early 1980’s except they worked in $10,000 increments. That’s inflation for you.

The $30,000 plumbing bid really came as a shock to me even though it included all of the plumbing for the house, our radiant heat flooring and the solar thermal hot water system. Still, with bills like that, how would be ever be able to build a house for under $250,000? Maybe the good news we were soon to receive would help.

One day after Phillip delivered that staggering plumbing bid, Larry Wilkins of Tempcast, sent us information about an income tax credit offered through the state of Utah for renewable energy systems. The investment tax credit for residential systems offers a 25 percent credit for qualifying equipment and installation costs up to a maximum of $2,000. The design of our house includes technologies that qualify for this tax credit, so Scott immediately filled out the application and sent it off.

The site entitled Incentives / Policies for Renewables and Efficiency also proved to be very useful as did this Financial Incentives site. If we receive all of the state and federal grants and tax credits we've just applied for, our $30,000 plumbing system will become a $23,000 plumbing system. Hooray for rebates!

Sunday, April 4, 2010

Floor Plans

This is one of the original drawings our architect, Wayne Bingham, made for the design our house. Because the bales of straw we'll be using are eighteen inches wide, there are two measurements for square footage  The interior of the house will be 1772 square feet. Our Logan house has 2050 square feet, but the space in the Torrey house will be much more usable. The exterior of our Torrey house will be 2025 square feet. When the plaster season rolls around, I've heard that we'll wish the house was much smaller.



After many hours of discussion with our family and friends (the people who really know how we live), there are only two changes we've made.

First, the masonry stove in the middle of the living space has been moved to the wall between the main living area and Scott's office on the left. We will build that wall out of adobe bricks. Our intention is that the heat from the stove will transfer to the bricks. That will provide additional heat to Scott's office at the same time it warms the area in which we will spend most of our time.

Second, the large wardrobe in our bedroom will need to house the solar water heating system. That means half of the closet space will eventually contain a 300-gallon water tank plus all the mechanical equipment that goes along with the system.

By the end of this summer we should be able to see the hope in the plans as reality on the ground.