Sunday, August 4, 2013

Kitchen of Our Dreams

I don’t really dream. At least if I do, I don’t remember them. So, when I recalled having bad dream after bad dream about tiling the kitchen counter, I thought it might be a message. That message was that this tiling endeavor would end in a huge and messy train wreck involving twisted Schluter profiles and back splash tiles falling off the wall into an overflowing sink. This was a project I was absolutely not looking forward to.

Despite bad dreams, we dove in head first in an attempt to have a working kitchen before our nephew Riley arrived from Seattle for a two-week visit.

Here is the kitchen prior to any counter work. As you can see, Rusty the cat is very interested to know what will happen next.

The cabinets against the strawbale wall.

Note the uneven surface of the wall and the rounded shoulder of the strawbale window ledge.


Scott brings in the first section of Kerdi Board. This "board" is hard foam board used in place of the two layers of exterior grade plywood and one layer of cement backer board we would have needed to install the tiled-under sink. Kerdi Board is fairly pricey, but we computed the cost of the plywood and backer board. Considering this and the amount of time saved using the Kerdi Board, we opted for the board.


Test fitting the sink

It fits.

The sink is proud of the Kerdi Board surface. To tile over the flange, the sink needs to be flush with the Kerdi Board.

Scott used a router to removed just enough Kerdi Board to allow for the sink to sit correctly.

It fits perfectly.

When we first made the window ledge, we did not know we were going to put tile here. We made a very nicely curved edge.

Tile requires square edges and 90 degree corners. To remedy the situation, we need to square up the edge so there is no gap between the tiled ledge and the wall. The first step is to rough up (Yikes!) our once beautiful wall.

Never fear. Soon we'll have a 90 degree corner, a vertical wall and a level window ledge.

More plaster.

More plaster.

Removing the plaster guide.

Scott filled in the gaps between the wall and the ledge.

Fine tuning...

Stentor, our cat, leaves his stamp of approval.

While the plaster dries, we finish installing the Kerdi Board on the remainder of the cabinets.

We test-fit the cook top.

I can see supper cooked in our completed kitchen in the near future.

We needed to decide between two patterns: a running bond (like bricks on a house) or all of the tiles lined up. After surveying our family and friends, we decided upon lining up the tiles.


The Kerdi Board didn't seem strong enough to support the overhang of the counter, so Scott made three braces from the wood left over from our timber framing days.


I'm glad we bought a band saw at a local garage sale.

We added thin set to make the surface of the window ledge level.


This membrane called Kerdi Band will provide a water-proof barrier between the kitchen counter and the strawbale wall.

Here Scott puts the first of the edge profile on the small counter just inside the door to the kitchen.

Next comes the field tiles.

Then the tile in the edge profile.
This is the practice layout before we used thin set to hold the tiles in place.

Now for the real thing...

Working on top of the counters...
Scott cut a beautiful curve.
Beginning the backsplash...


 



We're getting there.
Pete comes to inspect.
He thinks the color of the tile matches his eyes.
"A little to the left."
Scott continues laying out the field tiles...
while I finish the tiny pieces of backsplash under the window ledge.
Stentor feels very comfortable on this counter. This is where a cat belongs.

Nikki comes to help and to bring us good cheer.
Only a few steps to go.
Preparing to grout
Grouting the back splash
Phillip and McKay finish installing the cook top and sink faucet.
Scott prepares the first meal in our completed kitchen. Stir fry. Delicious!

Countertop Decisions

The first challenges to completing the kitchen counter were deciding what materials to use and then purchasing those materials and getting them to Torrey.

For ease of cleanup and stylish appearance, we really wanted an undermount sink. Solid surface materials such as granite, marble and quartz are some of the most common materials used with that type of sink, but the cost of those surfaces seemed prohibitive. Therefore we considered other options. That’s how we learned it is now possible to have an undermount sink with laminate. While that is very affordable, and we could definitely learn how to laminate a countertop, I was not sold on that look.

Since we had successfully completed a tile shower, counter and floor in the bathroom, tile became a more and more appealing material for the kitchen. That’s why we drove to Salt Lake to troll the tile stores on 3rd West where a good number of them are located. On that trip and others, we collected a good number of samples at Contempo Tile and Modern Tile. We returned to Torrey to contemplate colors and to make a final decision.

An issue we needed to address was how to keep water from the sink away from the straw bale wall. As you can imagine, water on that wall would have disastrous results. While I Iooked at tile color, texture and layout, Scott resorted to his typical behavior and did thorough research on products to address our concerns about water. Despite the expense, we decided to use metal profiles made by Schluter. From our perspective, their cove and edge profiles, used in conjunction with their waterproof membranes, were the best solution for our situation.

On a subsequent trip to Salt Lake, we met Rich Pease at Modern Tile. I cannot say enough about his outstanding help. Rich spent several hours looking at drawings of our kitchen, answering our questions and ordering everything we needed.
This included Eleganza’s unique metallic bronze tile to be used for the back splash and counter edge, all of the Schluter products we needed plus the tiles for the countertop. It was one-stop-shopping at its finest. Rich made it possible for much of this to be shipped directly to Torrey, and, at the same time, he saved us money. If you have a tile purchase in your future, Scott and I highly recommend Rich Pease and Modern Tile.

Certificate to Occupy

On June 4 we asked Eric Torgersen, the local building inspector, to walk through our house so we would know what needed to be completed in order to receive a certificate to occupy. Scott and I basically knew what would be on the list, but it was good to have an actual document enumerating these items:


* Lay a 3-foot by 3-foot landing outside each door.
* Complete all exterior electrical.
* Fir out all thresholds.
* Complete the kitchen counter.
* Finish the kitchen plumbing.
* Install electrical plates on the receptacles and cover the wires at the window seat.

If someone were to ask, “What did you do this summer?” all we would need to do is to hand them Eric’s list.